Question from the user: after the 0.11 → 0.14 iterations, does the instruction set given to the orchestrator/planner still make sense, or should it be simplified or refactored?

Method: measure what the planner actually receives, not what the source files look like. The two planner task files of dogfood run wf-mtdq1l9v-ed22fe (75t4n2, bullswarm building outputSchema in its own repo, runtime 0.13.2) are the specimens; sizes are characters of the task text (task-orchestrator-*.md), tokens ≈ chars / 4.

1. What one planner turn receives ​

sectionsourceturn 1turn 2
orchestrator prompt + worktree linegoal.js AUTONOMOUS_ORCHESTRATOR_PROMPT5 0005 000
PLANNING DOCTRINE (11 bullets)runtime.js runDecision3 6053 605
Action skeletons (6 shapes + verify semantics)runtime.js1 3421 342
Program skeleton (discovery → fan-out → verify → suite)runtime.js1 2171 217
Graph skeleton (two chains + suite) + fanout paragraph + runtime-owned lineruntime.js4 0544 054
durable context (JSON)runtime.js plannerContext17 474162 946
total32 730 (~8 k tokens)178 452 (~45 k tokens)

The fixed prefix is 15.2 k chars on every turn. The durable context grew 9× between turn 1 and turn 2 of the same run.

Where the 163 k of turn 2 went ​

keycharswhat it is
completedActions (19 entries)66 700every finished action with its full attempt records: routing candidates and pace numbers, usage, pricing table, child pid, timings — ~3.5 k per action
outputs (19 entries)41 560outputExcerpt of ~3 k chars for every finished action, including ones that finished ok and were already verified in the previous program
intent6 657the goal text (6.5 k) + cwd + policy — needed, once
failures1 073the two blocked actions — duplicates of completedActions entries
availablePools, budget, executionConstraints, closedPhases, …~1 800fine

2. What is said more than once ​

Reading the prefix as the planner does, the same rules appear two or three times in different words:

ruleorchestrator promptdoctrineskeletons
propose the whole program, one round trip costs minutesitem 2bullets 1, 2"all in ONE decision" ×2
N items → N run + N verify + one suite verifyitem 5"Per-item chains"Graph skeleton
unknown items → discovery + itemsFrom fan-outitem 5"Unknown item count"Program skeleton + fanout paragraph
every verify gets a repair policyitem 5"Verification failures"verify skeleton
completion: all-actions-ok on a clean programitem 5"Self-completing programs"—
self-contained worker prompts, file ownershipitem 3"File ownership", "Self-contained prompts"—
don't propose pool/addDir/taskFileclosing line—final line

Item 5 of the orchestrator prompt alone is 1 050 chars and restates four doctrine bullets. The two program skeletons both end in the same verify-items → verify-suite tail.

3. Does it matter? Measured ​

  • Turn 1 (32.7 k chars) took 637 s; turn 2 (178 k chars) took 390 s. Latency is therefore dominated by the model's reasoning on the goal, not by context size — the 6.5 k-char goal and a 12-action program cost more thinking than reading 45 k tokens. Trimming context is a cost and attention lever, not primarily a latency lever.
  • Cost: turn 2 read ~45 k tokens to emit a ~1 k-token decision. At Opus prices that is ~$0.25 per boundary; a run with four boundaries (goal 2 on 0.12.1) spends more on re-reading attempt metadata than on the decisions.
  • Attention: the planner's turn-2 reason correctly diagnosed the blocked graph, so quality did not visibly suffer here — but 64 k chars of pricing tables and routing candidates are noise it must skip to find the two ok:false concerns that matter.
  • Behaviour observed in three runs (goal 2, goal 3, dogfood): every rule the prefix repeats was followed on the first turn (whole program, per-item chains, repair policies, completion). No observed decision needed a rule to be stated twice.

4. Recommendation ​

Yes — refactor, in two independent pieces, both measurable:

A. Compact the durable context (the 9× growth). Planner-facing ledger rows instead of raw ledger entries: { id, type, phase, status, pool, durationSec, attempts, why } (~150 chars; 19 actions → ~3 k instead of 66.7 k). Keep a full outputExcerpt only for actions finished since the last decision and for every ok:false verify; older ok actions get a one-line summary (id, ok, first 200 chars). Replace failures with the ids of failing actions (their full entry already sits in the ledger). Expected turn-2 context: ~25 k chars instead of 163 k. Pure runtime change; no planner behaviour change intended.

B. One contract instead of three overlapping texts. Merge AUTONOMOUS_ORCHESTRATOR_PROMPT and the doctrine bullets into a single ordered list of ~10 rules (target ≤ 4 k chars, from 8.1 k), each stated once with its reason; keep exactly two JSON examples — the action shapes list and one complete program (discovery → data-driven fan-out → per-item verify with repair → suite verify, with completion) — and delete the second program skeleton (target ≤ 3 k, from 6.6 k). Total prefix ≤ 7 k chars, from 15.2 k.

Acceptance for both: unit tests on the context builder (row shape, excerpt policy by decision sequence) and on the prompt (each rule appears once; the skeleton assertions in tests/workflow-adaptive.test.js updated); then one re-run of goal 3 on the same fixture (baseline 0.13.1: 28 min 42 s, 1 planner turn, 294 s) to confirm the decision shape is unchanged and record the new per-turn size.

Not recommended: cutting the goal text or the scout excerpt from the context — both were used verbatim by every first-turn program observed.

5. Outcome ​

Measurements below were taken after the refactor from the current source and from the committed source saved into /tmp/goal-before.mjs and /tmp/runtime-before.js, using the same temporary measurement script. The canonical prefix is the complete emitted planner task text counted from its first character up to (not including) the durable-context marker, with the worktree-isolation suffix included. The committed baseline predates the named section exports, so its emitted prefix was reconstructed from the committed runtime.js task-text assembly and the committed AUTONOMOUS_ORCHESTRATOR_PROMPT.

  • Complete emitted planner task text up to the durable-context marker, worktree-isolation suffix included: OBSERVED, 16,316 characters before and 5,208 characters after. Command: node /tmp/measure-planner.mjs.
  • Static planner task-prefix array through the durable-context boundary: OBSERVED, 16,209 characters before and 5,101 characters after. The after value is 107 characters shorter because it excludes the unchanged worktree-isolation suffix; this is a secondary source-level measurement, not the canonical emitted-prefix headline. Command: node /tmp/measure-planner.mjs.
  • PLANNER_RULES_SECTION: OBSERVED, 2,202 characters after. Command: node /tmp/measure-planner.mjs.
  • PLANNER_EXAMPLES_SECTION: OBSERVED, 1,867 characters after. Command: node /tmp/measure-planner.mjs.
  • AUTONOMOUS_ORCHESTRATOR_PROMPT: OBSERVED, 4,670 characters after; the committed before source had no separately exported rules or examples sections, so separate before-section sizes are NOT AVAILABLE, not inferred. Command: node /tmp/measure-planner.mjs.
  • Sample durable context: OBSERVED baseline 163,000 characters in the audit's rounded turn-2 durable-context total (the detailed table records 162,946; the full turn-2 task was 178,452), and COMPUTED 23,547 characters after. The computed sample applies 19 compact ledger rows at 150 characters each, keeps a 3,000-character scout excerpt and two 3,000-character failing-verify excerpts, truncates the other 16 action excerpts to 200 characters, represents two failures as 20-character IDs, and retains the audit's 6,657-character intent and 1,800-character other-context components. Command: node /tmp/compute-context.mjs.

Deliverables:

  • Durable planner context shrank because completed actions are compact ledger rows, failures are IDs, and stale successful output is truncated.
  • Planner contract shrank because overlapping prompt/doctrine/skeleton text is now one ordered rules section plus exactly two JSON examples, single-sourced in src/workflow/goal.js.
  • Runtime prompt construction shrank because src/workflow/runtime.js imports the shared contract instead of carrying a duplicate doctrine and graph skeleton.
  • skill/SKILL.md was left unchanged: it documents the general durable context and the separate run-state/TUI attempt view, but does not document a renamed/dropped planner-context field shape such as the old attempt records or an old failures representation.

6. Second audit — after the goal-4 rerun on 0.15.0 (ydpjts) ​

Method: a Claude Code dynamic workflow (12 agents, 16 min) reviewed the COMPLETE turn-1 task text of run ydpjts (19,577 chars; 6,199-char prefix) and the program the planner wrote, from three lenses — width/critical path, worker-prompt authoring, clarity vs Claude's own workflow-authoring reference — and adversarially verified every new finding (refute-framed, source-checked). 3 known + 6 new findings survived; 2 were refuted (one because lane was dead text — see the runtime defect below — one for deleting a must-keep rule).

What the planner received said nothing wrong; it said too little in three places, and the example showed a linear program:

findingevidence on ydpjtscontract change
a verify's verdict was treated as a dependencytests dependsOn verify-src; 330 s idlerule 3: "a worker depends on the run that wrote its input files, never on that run's verify (a verdict is not data)"
width framed only as "known N items"one tests worker, 951 s, where three file-disjoint writers were allowedrule 4: "each file-disjoint unit ... one worker for N independent files is N chains in series"
outputSchema invited on a prose reportreport schema → stray key, then fenced tail → retry + planner turn (≈ 685 s)rule 6: schema only where a later action reads the object; prose gets none
repair cannot rewrite an answer under review (new)verify-report repair prompt asked the worker to "restate the report" — unreadable by design (repairAndReverify re-reads the original outFile)rule 7: "the repair edits files and cannot rewrite the answer under review, so reject only what a file edit can fix"
workers demanded npm test as acceptance (new)tests prompt: "No other worker is editing the tree while you run"shared-tree line: unit's focused command, never the full suite
no guidance on effort/lane (new)every action ran at build/mediumrule 10: planner sets lane and effort; they pick the model tier
example program was linear and not valid JSON (new)—example rewritten: {"actions":[…],"completion":…}, tests depend on fix and run beside verify-fix, lane/effort shown
runtime: planner lane silently overwritten (new)runner.js merged {...action, ...actionDefaults} so lane: build wonfixed: action overrides gate defaults; addDir stays runtime-owned; lane validated

Sizes after: rules 3,999 (cap 4,000), examples 2,938 (cap 3,000). Every rule still stated once with its reason. Acceptance: goal-4 rerun on the new contract with workers pinned to opencode2/relay/gpt-5.6-luna (strategy assignments high/medium/low, cleared after) — structural pass conditions: tests depend on impl-src not verify-src; more than one file-disjoint writer; parallelism ≥ 1.5; 0 repairs / corrections / schema retries; auto-completed; ≥ 299 tests, existing tests extended only; wall reported with the pool mix.

Outcome: r2vu9i (runtime d14c1fa) met every structural condition except "0 repairs" (4 rounds, 2 of them verifier moving-goalposts → re-verify scoping 9af8fdf); bizp4s (runtime 9af8fdf) then ran in 25 min 13 s with one planner turn (247 s), parallelism 1.77, 3 repair rounds each fixing a real defect, 0 schema retries / corrections, 319/319. Details in docs/experiments/2026-08-29-dogfood-bullswarm-builds-bullswarm.md.